| 注册
首页|期刊导航|广西水利水电|钦州市某水闸除险加固设计

钦州市某水闸除险加固设计

陆莉莉

广西水利水电Issue(4):28-32,5.
广西水利水电Issue(4):28-32,5.

钦州市某水闸除险加固设计

Reinforcement design for a water gate in Qinzhou City

陆莉莉1

作者信息

  • 1. 广西水利电力勘测设计研究院,广西 南宁 530023
  • 折叠

摘要

Abstract

  The water gate located in Qinzhou City is a large (II)-scale sluice privileged to irrigation incorporating with multiple purposes such as power generation, navigation and tourism etc., and had been put into operation for more than 50 years. For its reinforcement, after fully taking into account the factors including hydrology, geology, construction, operation, cost and influence on existing important structures, characteristics of various structures, a general layout scheme was recommended at the preliminary design stage, with shiplock and powerhouse arranged by left bank and right bank respectively. The reinforcement measures for major structures were also presented.

关键词

除险加固/枢纽布置/主要建筑物/水闸

Key words

Reinforcement/general layout of complex/major structures/water gate

分类

建筑与水利

引用本文复制引用

陆莉莉..钦州市某水闸除险加固设计[J].广西水利水电,2012,(4):28-32,5.

广西水利水电

1003-1510

访问量0
|
下载量0
段落导航相关论文