广西水利水电Issue(5):50-51,54,3.
万家口子水电站石料场开采规划
Rock quarrying planning for Wanjiakouzi Hydropower Station
李艺1
作者信息
- 1. 广西电力工业勘察设计研究院,广西 南宁 530023
- 折叠
摘要
Abstract
Wanjiakouzi Hydropower Station located in Yunan Province is designed with a RCC arch dam with total dam height of 157.6m. High monthly concreting intensity requires much rock materials. Proper rock quarrying plan⁃ning was conducted according to engineering geological conditions. Corresponding supports were constructed for the permanent high slope formed due to quarrying,so as to ensure high slope stability and rock material supply.关键词
水电站/石料场/开采/规划Key words
Hydropower station/rock quarry/quarrying/planning分类
建筑与水利引用本文复制引用
李艺..万家口子水电站石料场开采规划[J].广西水利水电,2012,(5):50-51,54,3.