瀑布沟水电站2#水轮发电机组调速器故障分析及处理

向文平 陈勇旭 李军路

广西水利水电Issue(5):64-66,3.
广西水利水电Issue(5):64-66,3.

瀑布沟水电站2#水轮发电机组调速器故障分析及处理

Fault analysis and treatment for No.2 governor of Pubugou General Hydroelectric Plant

向文平 1陈勇旭 1李军路1

作者信息

  • 1. 国电大渡河瀑布沟水力发电总厂,四川 汉源 625304
  • 折叠

摘要

Abstract

  During commissioning after maintenance,No.2 governor of Pubugou General Hydroelectric Plant had seen abnormal closing time and intense vibration in the course of closing. The governor has operated well up to now since treatment was conducted based on analysis of causes. The authors also present measures for preventing simi⁃lar faults.

关键词

水轮发电机/调速器/接力器/振动/故障/处理

Key words

Turbine generator unit/governor/servomotor/vibration/fault/treatment

分类

能源科技