| 注册
首页|期刊导航|广西水利水电|大伙房输水工程PCCP管安装静水压试验

大伙房输水工程PCCP管安装静水压试验

张海森 王平

广西水利水电Issue(6):50-53,4.
广西水利水电Issue(6):50-53,4.

大伙房输水工程PCCP管安装静水压试验

Static water pressure test for PCCP pipe installation of Dahuofang Water Transmission Project

张海森 1王平1

作者信息

  • 1. 中国水电建设集团辽宁工程局有限公司,辽宁 沈阳 110179
  • 折叠

摘要

Abstract

  According to arrangement of PCCP pipes and butterfly valves of Dahuofang Water Transmission Project, the pipes were divided into 6 sections for static water pressure test, A pipe and B pipe with 3 sections respectively. Based on a brief introduction of the purpose and prepare work of the test, the authors present in details the proce⁃dures, method, trouble-shooting and results evaluation of static pressure test.

关键词

输水管道/水压试验/渗水量/大伙房输水工程

Key words

Water transmission pipe/water pressure test/seepage amount/Dahuofang Water Transmission Project

分类

建筑与水利

引用本文复制引用

张海森,王平..大伙房输水工程PCCP管安装静水压试验[J].广西水利水电,2012,(6):50-53,4.

广西水利水电

1003-1510

访问量0
|
下载量0
段落导航相关论文