广西水利水电Issue(6):59-62,4.
浅谈漫湾电厂二期调速器的调试
Governor commissioning of 2nd-stage project of Manwan Hydropower Station
岳建锋 1樊锦1
作者信息
- 1. 华能澜沧江水电有限公司检修分公司,云南 昆明 650000
- 折叠
摘要
Abstract
Governor is one of the major equipment of a hydropower station. Operation parameters of governor are di⁃rectly related to safety of power grid and quality of electric energy. Upgrade of governor can improve quality of pow⁃er grid. A summarization was made on the experience in governor commissioning and maintenance of 2nd-stage project of Manwan Hydropower Station.关键词
调速器/调试/漫湾电厂Key words
Governor/commissioning/Manwan Hydropower Station分类
能源科技引用本文复制引用
岳建锋,樊锦..浅谈漫湾电厂二期调速器的调试[J].广西水利水电,2012,(6):59-62,4.