长沙综合枢纽三期施工导流及通航模型试验研究

蒋明锋 李帆 刘方舟 乾东岳

水道港口2013,Vol.34Issue(3):243-247,5.
水道港口2013,Vol.34Issue(3):243-247,5.

长沙综合枢纽三期施工导流及通航模型试验研究

Model test study on construction diversion and navigation condition in 3rd period of Changsha comprehensive junction

蒋明锋 1李帆 2刘方舟 2乾东岳2

作者信息

  • 1. 长沙市湘江综合枢纽开发有限责任公司,长沙410000
  • 2. 长沙理工大学,长沙410076
  • 折叠

摘要

Abstract

According to the characteristics of the third phase of construction diversion,the river flood capacity and navigation flow conditions were studied by integrated physical model with the scale of 1:100.By analyzing the rising value of upstream water level,the flow field characteristics near the cofferdam and the flow velocity,three kinds of optimized schemes were proposed to increase the overflow width and adjust the direction of longitudinal cofferdam and water flow.Based on the characteristics of the third phase of construction diversion and the comparison of rising value of upstream water level between different construction diversion schemes,the recommended proposal which was conducive to the river flood and construction layout was obtained.Finally,the flow field analysis shows that the flow condition of the recommended proposal meets the requirements of navigation safety.

关键词

长沙综合枢纽/施工导流/模型试验

Key words

Changsha comprehensive junction/ construction diversion/ model experiment

分类

建筑与水利

引用本文复制引用

蒋明锋,李帆,刘方舟,乾东岳..长沙综合枢纽三期施工导流及通航模型试验研究[J].水道港口,2013,34(3):243-247,5.

基金项目

湘江长沙综合枢纽公司项目(CSSN-工程-033) (CSSN-工程-033)

水道港口

OACSTPCD

1005-8443

访问量0
|
下载量0
段落导航相关论文