水力发电学报2013,Vol.32Issue(4):166-170,176,6.
高拱坝整体稳定地质力学模型综合法试验与数值分析
Experiment and numerical analysis on global stability of high arch dam geomechanical model
摘要
Abstract
The site of Dagangshan arch dam are featured with complicated geologic structures of various types of dikes,faults,joints and fissures,and its global stability is greatly influenced by these structures.In this work,methods of geomechanical model test and 3D nonlinear FEM calculation were used to study the global stability,including an analysis on geological defects,dam deformation,abutment displacements,failure process and failure mechanism.This analysis shows global safety factors of 5.0 ~5.6 by model test and 5.6 ~ 6.0 by FEM computation.On the basis of these factors,dam safety is evaluated and reinforcement measures are suggested.关键词
水工结构/稳定/综合法试验/拱坝/地质力学模型/三维非线性有限元法Key words
hydraulic structure/ stability/ comprehensive method test/ arch dam/ geomechanical model/ 3D nonlinear FEM分类
建筑与水利引用本文复制引用
段斌,张林,陈刚,董建华,陈建叶..高拱坝整体稳定地质力学模型综合法试验与数值分析[J].水力发电学报,2013,32(4):166-170,176,6.基金项目
国家自然科学基金(50879050) (50879050)
国家重点基础研究发展973计划(2010CB226802) (2010CB226802)
博士学科点专项科研基金(20100181110077) (20100181110077)