探矿工程-岩土钻掘工程Issue(9):39-40,44,3.
汶川地震断裂带科学钻探项目WFSD -2孔防漏固井技术研究与应用
Anti-leakage Cementing Technology with Low Density Slurry in WFSD-2 of Wenchuan Earthquake Fault Scien-tific Drilling Project
摘要
Abstract
Due to the broken stratum, wall collapsing, landslide accidents and lost circulation happened frequently in the drilling of the second hole of Wenchuan earthquake fault scientific drilling project (WFSD-2).For preventing lost circu-lation during cementing, anti-leakage cementing technology with low density slurry was selected.Through multiple perform-ance experiment of slurry, the formulation of low density slurry for anti-leak was optimized.This formulation was successful-ly adopted to cement theø168.3 casing in WFSD-2.关键词
汶川地震/地震断裂带/科学钻探/低密度水泥浆/防漏/固井Key words
Wenchuan earthquake/earthquake fault/scientific drilling/low-density slurry/anti-leakage/cementation分类
天文与地球科学引用本文复制引用
李前贵,李旭东,贾军,张培丰,李早元..汶川地震断裂带科学钻探项目WFSD -2孔防漏固井技术研究与应用[J].探矿工程-岩土钻掘工程,2012,(9):39-40,44,3.基金项目
科技部科技支撑计划专项“汶川地震断裂带科学钻探(WFSD)”项目之“科学钻探与科学测井”课题 (WFSD)