探矿工程-岩土钻掘工程Issue(9):45-48,4.
汶川地震断裂带科学钻探项目WFSD -2孔钻井液工艺研究
Research on Drilling Fluid Technology for WFSD-2 Hole of Wenchuan Earthquake Fault Scientific Drilling Pro-ject
摘要
Abstract
The geological conditions were extremely complicated with poor wall stability in WFSD-2 hole drilling construc-tion of Wenchuan earthquake fault scientific drilling project.Due to the water-sensitive formation of mineral water swelling, broken strata and stress release, the hole wall necking, collapsing and leakage happened many times.Through the adjust-ment and maintenance of the formulation, parameters, and solid control, LBM-GLA drilling fluid system with a low vis-cosity synergy powder and modified asphalt as the main raw materials was adopted in the construction;the above problems were successfully solved.This article mainly describes the use and maintenance of drilling fluid in each section of WFSD-2 hole.关键词
汶川地震/地震断裂带/科学钻探/复杂地层/孔壁稳定/钻井液体系Key words
Wenchuan earthquake/earthquake fault/scientific drilling/complex formation/hole wall stability/drilling fluid system分类
天文与地球科学引用本文复制引用
陶士先,陈礼仪,单文军,李之军,李晓东,张涛..汶川地震断裂带科学钻探项目WFSD -2孔钻井液工艺研究[J].探矿工程-岩土钻掘工程,2012,(9):45-48,4.基金项目
科技部科技支撑计划专项“汶川地震断裂带科学钻探(WFSD)”项目之“科学钻探与科学测井”课题 (WFSD)