| 注册
首页|期刊导航|探矿工程-岩土钻掘工程|大宝山钼矿复杂地层钻探技术

大宝山钼矿复杂地层钻探技术

王勇 孙平贺 赵仁明 乌效鸣

探矿工程-岩土钻掘工程Issue(11):22-25,4.
探矿工程-岩土钻掘工程Issue(11):22-25,4.

大宝山钼矿复杂地层钻探技术

Drilling Technology in Complex Stratum of Dabaoshan Molybdenum Mine

王勇 1孙平贺 2赵仁明 1乌效鸣3

作者信息

  • 1. 广东省地质勘查局705地质大队,广东韶关512023
  • 2. 中南大学地球科学与信息物理学院,湖南长沙410083
  • 3. 中国地质大学枙武汉枛工程学院,湖北武汉430074
  • 折叠

摘要

Abstract

  The stratum is complicated in Dabaoshan molybdenum mine.Leakage, block falling, borehole collapsing and di-ameter shrinkage often occurred and coring was difficult for drilling tool breaking, sticking, bit burning and burying.By se-lection of rational drilling technologies, wall protection and leakage control methods and drilling coring methods, the de-tailed survey and prospecting drilling were smoothly completed.The paper introduced the drilling technology in the complex formation of Dabaoshan molybdenum mine.

关键词

复杂地层/钻探/护壁堵漏/绳索取心钻进/大宝山钼矿

Key words

complex stratum/drilling/wall protection and leakage control/wire-line coring drilling/Dabaoshan molybde-num mine

分类

地质学

引用本文复制引用

王勇,孙平贺,赵仁明,乌效鸣..大宝山钼矿复杂地层钻探技术[J].探矿工程-岩土钻掘工程,2012,(11):22-25,4.

基金项目

岩土钻掘与防护教育部工程研究中心2011年度开放基金资助 ()

探矿工程-岩土钻掘工程

2096-9686

访问量0
|
下载量0
段落导航相关论文