施工阶段围岩分类法在橙子沟水电站的试用
Trial Application of Surrounding Rock Classification at Construction Stage, Chengzigou Hydropower Project
杨洋 1李明刚 1龚会志 1宋身修 2傅金筑3
作者信息
- 1. 甘肃电投大容公司,兰州 730030
- 2. 甘肃省水利水电勘测设计院,兰州 730000
- 3. 中国水电顾问集团西北勘测设计研究院,西安 710065
- 折叠
摘要
Abstract
Trial application of surrounding rock classification at construction stage of Chengzigou Hydropower Project is introduced.Re-sults by both surrounding rock classification and existing classification being applied currently are compared.Amendment of surrounding rock classification at construction stage and benefits from trial application of surrounding rock classification of Chengzigou Hydropower Project are described.关键词
围岩分类法/隧洞施工/工程地质/橙子沟水电站Key words
Surrounding Rock Classification/tunneling construction/engineering geology/Chengzigou Hydropower Project分类