| 注册
首页|期刊导航|中国电力|水电与风电联合运行分析

水电与风电联合运行分析

辛颂旭

中国电力2013,Vol.46Issue(8):85-89,5.
中国电力2013,Vol.46Issue(8):85-89,5.

水电与风电联合运行分析

Combined Operation Analysis of Hydropower and Wind Power

辛颂旭1

作者信息

  • 1. 国网能源研究院,北京 100052
  • 折叠

摘要

Abstract

Along with the rapid development of wind power in China in recent years,wind discarding problem is becoming increasingly serious.Further improving the regulating capacity of existing power systems is therefore needed.Combined operation of hydropower and wind power is one of the effective measures in the near future.In this paper,the intraday and inter-day output characteristics of wind power were introduced.On the basis of an analysis of the basis for combined operation of hydropower and wind power in terms of seasonal features and regulation speed,the combined operation principles of wind power and hydropower,and the benefits for promoting wind power accommodation and enhancing the efficiency of thermal power were studied.In order to compare the differences,two cases were designed.In one case the hydropower and wind power operated jointly,and in another case they operated separately.The differences of the two cases were analyzed in terms of wind power accommodation,coal consumption per kWh,thermal power start & stop cost,and the total fuel consumption.The results verified the benefits of the combined operation.

关键词

水电/风电/联合运行

Key words

hydropower/ wind power/ combined operation

分类

信息技术与安全科学

引用本文复制引用

辛颂旭..水电与风电联合运行分析[J].中国电力,2013,46(8):85-89,5.

中国电力

OA北大核心CSCDCSTPCD

1004-9649

访问量0
|
下载量0
段落导航相关论文