安徽农业科学2013,Vol.41Issue(15):6841-6843,3.
天津地区表流人工湿地冬季运行工艺研究
Study on Winter Operation Process of the Surface Flow Constructed Wetland in Tianjin Area
摘要
Abstract
[Objective] The research aimed to study winter operation process of the surface flow constructed wetland in Tianjin area.[Method] In view of climate characteristics in Tianjin,by the way of running under the ice,winter operation experiment of the surface flow constructed wetland in Tianjin was conducted,with the expectation to get some useful process parameters to run such systems in North China in winter.[Result] Although water purification effect in winter by surface flow constructed wetland was worse than that in other seasons (average reduction of about 20%),surface flow constructed wetland running under the ice was feasible in Tianjin area.When surface flow constructed wetland in North China ran under ice in winter,it was suggested that the outlet must be located in a low position to prevent to be completely frozen,and running water depth should not be less than 50-60 cm.The hydraulic load could be raised on the basis of reflux,and hydraulic retention time should be maintained less than 4 d to keep water-soil interface not freeze.Sampling water depth should be increased as much as possible to improve temperature in system.[Conclusion] The research could provide reference for promotion and application of the surface flow constructed wetland in North China.关键词
表流人工湿地/运行工艺/冬季/天津地区Key words
Surface flow constructed wetland/ Operation process/ Winter/ Tianjin area分类
农业科技引用本文复制引用
秦晓丹,孙贻超,李莉,邵晓龙,于丹,刘琼琼,刘红磊,韩琳..天津地区表流人工湿地冬季运行工艺研究[J].安徽农业科学,2013,41(15):6841-6843,3.基金项目
水利部公益性行业科研专项(2011-BH140002). (2011-BH140002)