摘要

Abstract

Using the numerical simulation method,the authors forecast the impacts of a hydropower station project construction on the plain of Dadu River on the groundwater to provide references for the construction.The results show that,when the project is completed,the anti-seepage wall blocks the contact between the river and the groundwater in the terrace,so the two terraces on the right bank become more closed hydrogeological units than before.In dry season,the groundwater water-level will draw down larger in the two closed terraces.Compared with the current dry period,it will decline 0.43~0.97m and 0.47~1.59 m,respectively.In the high water period,the waterlogging may appear in local low-lying areas.In the left bank area,the relationship between groundwater and rivers is still maintained and the groundwater will be less influenced.The authors recommend that the problem of drinking water for the villagers should be properly settled and the surface drainage measures be done well.

关键词

平原水库/水电站/数值模拟/地下水

Key words

plain reservoir/ hydropower station/ numerical simulation/ groundwater