| 注册
首页|期刊导航|国际设备工程与管理(英文版)|Production Planning and Control of the Pipeline Assembly Enterprise under SCM

Production Planning and Control of the Pipeline Assembly Enterprise under SCM

JING Lian-tian LIU Lang

国际设备工程与管理(英文版)2013,Vol.18Issue(3):159-164,6.
国际设备工程与管理(英文版)2013,Vol.18Issue(3):159-164,6.

Production Planning and Control of the Pipeline Assembly Enterprise under SCM

Production Planning and Control of the Pipeline Assembly Enterprise under SCM

JING Lian-tian 1LIU Lang1

作者信息

  • 1. School of Management, Northwestern Polytechnical University, Xi'an 710072, P.R.China
  • 折叠

摘要

关键词

SCM/production plan and control/postponement/bottleneck

Key words

SCM/production plan and control/postponement/bottleneck

引用本文复制引用

JING Lian-tian,LIU Lang..Production Planning and Control of the Pipeline Assembly Enterprise under SCM[J].国际设备工程与管理(英文版),2013,18(3):159-164,6.

国际设备工程与管理(英文版)

1007-4546

访问量0
|
下载量0
段落导航相关论文