国际设备工程与管理(英文版)2013,Vol.18Issue(3):159-164,6.
Production Planning and Control of the Pipeline Assembly Enterprise under SCM
Production Planning and Control of the Pipeline Assembly Enterprise under SCM
JING Lian-tian 1LIU Lang1
作者信息
- 1. School of Management, Northwestern Polytechnical University, Xi'an 710072, P.R.China
- 折叠
摘要
关键词
SCM/production plan and control/postponement/bottleneckKey words
SCM/production plan and control/postponement/bottleneck引用本文复制引用
JING Lian-tian,LIU Lang..Production Planning and Control of the Pipeline Assembly Enterprise under SCM[J].国际设备工程与管理(英文版),2013,18(3):159-164,6.