应用数学和力学2013,Vol.34Issue(9):986-994,9.DOI:10.3879/j.issn.1000-0887.2013.09.012
大跨度屋盖钢结构拆撑过程模拟分析的约束方程法
Constraint Equation Method for Analysis of Removing Temporary Supports From Large-Span Steel Roof
摘要
Abstract
Four calculation methods for numerical simulation analysis of removing temporary supports from large-span steel roof were introduced——support displacement method,equivalent rod bottom-end displacement method,jack element method and jack-gap element method.Then a new method,constraint equation method,was proposed.All the methods mentioned above were used separately to analyze the process of removing temporary supports from a threepoint-support beam which was fixed at both ends.The comparisons of results obtained by these methods indicate that the proposed constraint equation method is rational and effective for accurate simulation analysis of removing temporary supports to steel structural roof.关键词
大跨度钢结构/拆撑过程模拟分析/千斤顶卸载单元/约束方程法Key words
large-span steel structure/ simulation of removing temporary supports/ unloading jack element / constraint equation method分类
建筑与水利引用本文复制引用
郭小农,邱丽秋,罗永峰,叶智武,罗立胜..大跨度屋盖钢结构拆撑过程模拟分析的约束方程法[J].应用数学和力学,2013,34(9):986-994,9.基金项目
The National Natural Science Foundation of China(51078289) (51078289)
国家自然科学基金资助项目(51078289) (51078289)