高电压技术2013,Vol.39Issue(11):2609-2614,6.DOI:10.3969/j.issn.1003-6520.2013.11.006
基于极限承载力分析的覆冰输电塔可靠性评估
Reliability Evaluation for Iced Tower Based on Ultimate Bearing Capacity Analysis
摘要
关键词
输电塔-线体系/覆冰/一次二阶矩法/可靠性/极限承载力/博弱杆塔Key words
tower-line system/icing/first-order second-moment method/reliability/ultimate bearing capacity/weakest tower引用本文复制引用
姚陈果,李宇,周泽宏,李成祥,张磊,左周..基于极限承载力分析的覆冰输电塔可靠性评估[J].高电压技术,2013,39(11):2609-2614,6.基金项目
基金资助项目:国家重点基础研究发展计划(973计划)(2009CB724502) (973计划)