水科学进展2014,Vol.25Issue(2):260-267,8.
城市降雨径流控制LID BMPs规划方法及案例
LID-BMPs planning for urban runoff control and case study
摘要
关键词
城市降雨径流/低影响开发/最佳管理措施/模拟与分析集成系统/灵敏度分析/佛山Key words
urban runoff/ low impact development/ best management practices/ simulation and analysis integration system/ sensitivity analysis/ Foshan分类
建筑与水利引用本文复制引用
贾海峰,姚海蓉,唐颖,YU Shawlei..城市降雨径流控制LID BMPs规划方法及案例[J].水科学进展,2014,25(2):260-267,8.基金项目
The study is financially supported by the National Natural Science Foundation of China (No.51278267) and the National Water Pollution Control and Management S&T Specific Projects of China (No.2011ZX07301-003).国家自然科学基金资助项目(51278267) (No.51278267)
国家水污染控制与治理科技重大专项(2011ZX07301-003) (2011ZX07301-003)