| 注册
首页|期刊导航|城市建筑|城市高架桥箱梁架设施工技术

城市高架桥箱梁架设施工技术

朱京辉

城市建筑Issue(20):84-86,3.
城市建筑Issue(20):84-86,3.

城市高架桥箱梁架设施工技术

Construction Technology of City Viaduct Box Beam

朱京辉1

作者信息

  • 1. 中铁大桥局第四工程有限公司,南京210031
  • 折叠

摘要

Abstract

With the rapid development of city road, there are a variety of viaduct and position in the city road in higher. This paper takes Shenzhen Danping Expressway concrete box gird-er construction as an example, introduces in the city viaduct construction process, using the car for box girder erection cra-ne, which can meet the requirement of construction technology, at the same time, saving time, reducing cost, provides a reason-able economy construction technology for the city of box gir-der.

关键词

箱梁架设/汽车吊/交通疏解/方案比选/安全

Key words

box girder erection/car hoists/traffic organization/project selection/safety

引用本文复制引用

朱京辉..城市高架桥箱梁架设施工技术[J].城市建筑,2013,(20):84-86,3.

城市建筑

1673-0232

访问量2
|
下载量0
段落导航相关论文