This article discusses a new construction technolo-gy, namely by the cement mixing pile technology to cure sand bed first, then cure the mixing pile by water recycling method to dril the projected depth so as to reach the curing process of sand bed. This technique not only improve the friction resis-tance of sand, but also prevent the sand bed landslide, and re-ach the purpose of achieving the cost savings, speeding up the construction progress, and making sure the engineering quali-t y.关键词