城市建筑Issue(22):81-81,105,2.
地铁运营线路既有普通扣件地段更换谐振式浮轨扣件施工工艺
The Ordinary Fasteners Replace into Resonant Floating Rail Fasteners Construction Technology in the Operation Lines of Subway
摘要
Abstract
In this article, the author takes the track project in the subway construction as the background, describes how to replace the resonant floating rail fastener from the existing or-dinary fastener in the subway operation lines.关键词
地铁运营线路/谐振式浮轨扣件/施工工艺Key words
subway lines in operation/resonant floating rail fasteners/construction technology引用本文复制引用
纪学伟..地铁运营线路既有普通扣件地段更换谐振式浮轨扣件施工工艺[J].城市建筑,2013,(22):81-81,105,2.