| 注册
首页|期刊导航|城市建筑|超长双拼钢管支撑施工技术

超长双拼钢管支撑施工技术

姜勇 徐杰 金泸栋

城市建筑Issue(22):86-87,2.
城市建筑Issue(22):86-87,2.

超长双拼钢管支撑施工技术

Super Long Two-part Steel Pipe Support Construction Technology

姜勇 1徐杰 1金泸栋1

作者信息

  • 1. 中国建筑股份有限公司上海分公司,上海 200126
  • 折叠

摘要

Abstract

To the general foundation pit, enclosure design us-ual y from the view of cost, using methods ofφ609 × 16 steel projectile support+prestressed, to effectively control the defo-rmation of foundation pit. The east of the engineering found-ation pit enclosure using long two-partφ 609 × 16 steel pipe left oblique support (up to 29.4 m)+partial single pipe support, and achieved good comprehensive benefits.

关键词

超长/双拼/斜抛支撑/安装/功效

Key words

super long/two-part/stant cast support/instal ati-on/efficacy

引用本文复制引用

姜勇,徐杰,金泸栋..超长双拼钢管支撑施工技术[J].城市建筑,2013,(22):86-87,2.

城市建筑

1673-0232

访问量0
|
下载量0
段落导航相关论文