摘要
Abstract
With the development of urban modernization, the accelerating rhythm, ground transportation in the great cities became more and more crowded, the subway has become a n-ew traf ic tools. Metro construction support method currently including the high pressure jet grouting pile, underground co-ntinuous wal and so on, because the later has advantages of h-igh rigidity, high integrity, strong adaptability are more prom-inent, which has been applied more and more widely.关键词
连续墙施工/渗漏水防治/措施分析Key words
continuous wal construction/water leakage prev-ention/measures analysis