城市建筑Issue(22):100-101,2.
柳树沟水电站厂房上部钢管柱混凝土施工
The Upper Column Steel Tube Concrete Construction of Hydropower Plant Powerhouse in Willow Gully
李仝牢 1张锡良2
作者信息
- 1. 葛洲坝集团第一工程有限公司
- 2. 葛洲坝集团第一工程有限公司柳树沟项目部
- 折叠
摘要
Abstract
Using the steel tube column replace the original re-inforced concrete bent above the generator layer in Xinjiang Wil ow gul y hydropower plant and reduce the equal intensit-y time of concrete, which create conditions for the subsequent bridge girder hoisting and the unit instal ation, and provide the reality basis of macro decision-making for total project period planning.关键词
柳树沟水电站/厂房/钢管柱混凝土施工Key words
hydropower Station of Wil ow Gul y/plant/steel columns concrete construction引用本文复制引用
李仝牢,张锡良..柳树沟水电站厂房上部钢管柱混凝土施工[J].城市建筑,2013,(22):100-101,2.