城市建筑Issue(2):80-80,1.
盾构隧道小净距施工处理措施
Construction Measures of Shield Tunnel with Small Interval
摘要
Abstract
The construction quality of tunnel with smal inter-val plays an important role in the entire tunnel construction qu-ality. In order to avoid the adverse effects caused by the smal interval tunnel construction on the tunnel structure, the author carries on the detailed discussion of concrete construction tec-hnology measures during the construction of small interval tu-nnel, hoping to help of col eagues.关键词
盾构法隧道/小净距施工/处理措施Key words
shield tunnel/tunnel with smal interval/treatme-nt measures引用本文复制引用
戴升宏..盾构隧道小净距施工处理措施[J].城市建筑,2014,(2):80-80,1.