立管卡子“后安装”方法应用介绍
Introduction of Stand Pipe Clip“After Installation”Method Applications
费愚 1李晓睿 1陈立国 1张佐明 1刘帅 1吴华林1
作者信息
- 1. 海洋石油工程股份有限公司,天津300452
- 折叠
摘要
Abstract
Stand pipe system is the structure facilities of sub-marine pipeline landing platform and land. Through the BZ28-1 friendship single-point vertical tube instal ation engineering examples, it introduces riser system supporting component--stand pipe clip“After instal ation”method, showing the practi-cability and economy of the “After instal ation”technology, provides valuable experiences for other members late riser sy-stem instal ation.关键词
海洋平台/立管卡子/“后安装”方法/单点立管Key words
offshore platform/Stand pipe clip/“Aafter instal-ation”method/single-point vertical tube引用本文复制引用