城市建筑Issue(6):57-57,60,2.
地铁暗挖车站钢管混凝土柱设计及程序开发
Metro Covered Digging Station Concrete Filled Steel Tubular Column Design and Program Development
孙喜军1
作者信息
- 1. 中铁工程设计咨询集团济南院,济南250022
- 折叠
摘要
Abstract
Steel tube concrete column is the main stress co-mponents of subway station, to improve the subway design ef-ficiency of staff, needs to develop computation program of the concrete steel pipe column of the subway station, to solve pro-blems of repeated manual calculation in design, popularizes c-alculation program widely after it’s ful y mature.关键词
地铁/钢管混凝土柱/程序开发Key words
subway/concrete fil ed steel tubular column/pro-gram development引用本文复制引用
孙喜军..地铁暗挖车站钢管混凝土柱设计及程序开发[J].城市建筑,2014,(6):57-57,60,2.