| 注册
首页|期刊导航|城市建筑|地铁暗挖车站钢管混凝土柱设计及程序开发

地铁暗挖车站钢管混凝土柱设计及程序开发

孙喜军

城市建筑Issue(6):57-57,60,2.
城市建筑Issue(6):57-57,60,2.

地铁暗挖车站钢管混凝土柱设计及程序开发

Metro Covered Digging Station Concrete Filled Steel Tubular Column Design and Program Development

孙喜军1

作者信息

  • 1. 中铁工程设计咨询集团济南院,济南250022
  • 折叠

摘要

Abstract

Steel tube concrete column is the main stress co-mponents of subway station, to improve the subway design ef-ficiency of staff, needs to develop computation program of the concrete steel pipe column of the subway station, to solve pro-blems of repeated manual calculation in design, popularizes c-alculation program widely after it’s ful y mature.

关键词

地铁/钢管混凝土柱/程序开发

Key words

subway/concrete fil ed steel tubular column/pro-gram development

引用本文复制引用

孙喜军..地铁暗挖车站钢管混凝土柱设计及程序开发[J].城市建筑,2014,(6):57-57,60,2.

城市建筑

1673-0232

访问量0
|
下载量0
段落导航相关论文