Confronted by the problem of tremendous curtailment of wind power in the power grids of Northeast China,North China and Northwest China during heating period in winter,it is proposed that the constraint of forced power output determined by heat be decoupled by installing an electric boiler in the thermoelectric plant.The basic operating principles of the method are described,the implementation mechanism discussed,the mathematical model for evaluating its coal-saving benefit and role in national economy is developed,and the influencing factors are analyzed.The theoretical analysis and realistic examples show that the method is both coal-saving and economically feasible for the power grids of Northeast China,North China and Northwest China with significantly curtailed wind power.

关键词

风电消纳/热电联产/电锅炉/热电解耦/弃风

Key words

wind power accommodation/combined heat and power (CHP)/electric boiler/heat and power decoupling/curtailed wind