首页|期刊导航|电网技术|考虑输电线路负载率约束和全规划周期柔性成本评估的电网规划方法

考虑输电线路负载率约束和全规划周期柔性成本评估的电网规划方法

孙伟卿 王承民 张焰

电网技术Issue(10):2985-2990,6.
电网技术Issue(10):2985-2990,6.

考虑输电线路负载率约束和全规划周期柔性成本评估的电网规划方法

A Power Grid Planning Method Considering Transmission Line Load Rate Constraint and Flexible Cost Evaluation Within Full Planning Cycle

孙伟卿 1王承民 2张焰2

作者信息

  • 1. 上海理工大学 光电信息与计算机工程学院,上海市 杨浦区 200093
  • 2. 上海交通大学 电子信息与电气工程学院,上海市 闵行区 200240
  • 折叠

摘要

Abstract

In allusion to the poor adaptability of existing power grid planning methods to future uncertain factors and to enhance the robustness of power grid its own, through the flexible expression of load rate constraint of transmission line a part of power flow transmission capability is reserved during the planning to obligate a certain security margin and adaptive capacity for uncertain factors. Meanwhile, through the evaluation on power grid investment cost, operational cost and income from reliability within full planning cycle of power grid, a power grid planning model considering grid economy, security and reliability is proposed and solved by ant colony algorithm. Results of Graver 6-bus test system show that the proposed power grid planning method is effective and feasible, and is favorable to improve the uniform degree of line load rate distribution and reduce the risk of falling into self-organized critical state or occurring large-scale cascading failure, besides using the proposed power grid planning method grid resources can be optimized comprehensively during full power grid planning cycle.

关键词

不确定因素/负载率约束/全规划周期柔性成本/综合优化

Key words

uncertain factor/load rate constraint/flexible cost within full planning cycle/comprehensive optimization

分类

信息技术与安全科学

引用本文复制引用

孙伟卿,王承民,张焰..考虑输电线路负载率约束和全规划周期柔性成本评估的电网规划方法[J].电网技术,2013,(10):2985-2990,6.

基金项目

国家863高技术基金重大项目(2011AA05AA103)。The National High Technology Research and Development Programme of China (863 Programme)(2011AA05AA103) (2011AA05AA103)

电网技术

OA北大核心CSCDCSTPCD

1000-3673

访问量0
|
下载量0
段落导航相关论文