Construction Process of Steel Structure Hoisting on Top of Coal Silo in Huanghua Port Phase-3 Project

严密 1袁吴翔2

作者信息

  • 1. 中交第一航务工程局第四工程有限公司,天津 300450
  • 2. 中交第一航务工程勘察设计院有限公司,天津 300222
  • 折叠

摘要

Abstract

In 300,000 tons coal silo project of Shenhua Huanghua Port,the largest single-piece of steel structure is 380 tons in weight, which is lifted on top of the coal silo. Being restricted by site condition, two sets of 250t cranes are required for lifting steel structure on top of the silo by using double-crane lifting method. The construction sequence of portal frame at first and girder at second is adopted to guarantee the safety and economy of the hoisting construction, and complete the construction work smoothly, which will provide references for similar overhead hoisting of steel structure.

关键词

黄骅港/储煤筒仓/顶部钢结构/高空吊装/双机抬吊

Key words

Huanghua Port/coal silo/top steel structure/overhead hoisting/double-crane lifting