摘要
Abstract
Protruding mountain body on the left bank downstream of main dam of Junshan Reservoir leads to energy dissipation problem. By comparative tests and study of multiple alternatives,the rationality of overflow dam layout plan was demonstrated,and a energy dissipation scheme suited to the actual conditions of the project was recom-mended,as a good solution for overflow dam energy dissipation and scour prevention. The project had been de-signed and constructed according to the recommended scheme,and had been put into operation after completion ac-ceptance.关键词
溢流坝/消能/防冲/水工模型/试验/峻山水库Key words
Overflow dam/energy dissipation/scour prevention/hydraulic model/test/Junshan Reservoir分类
建筑与水利