Governor static characteristics test and analysis of Nabi Hydropower Station

吕油库 1吕帅库2

作者信息

  • 1. 广西右江水利开发有限责任公司,广西 南宁 530029
  • 2. 广西田林县那比水力发电有限公司,广西 百色 533000
  • 折叠

摘要

Abstract

Combined with the whole process of governor static characteristics test at Nabi Hydropower Station ,an introduction was made on the objectives,principle,conditions,testing method,process and results of the test. Based on analysis of the testing results,it was concluded that the governors of Nabi Hydropower Station can satisfy the requirements for safe and stable operation of power grid.

关键词

调速器/静特性实验/永态转差率/最大非线性度/转速死区/那比水电站

Key words

Governor/static characteristics test/permanent droop/maximum nonlinearity/speed dead zone/Na-bi Hydropower Station