摘要
Abstract
Chiem Hoa hydropower station is the last one of the four cascade stations planned on the tributary of Jin-jiang River in Vietnam,which is known as the first green hydropower station in Vietnam. The paper makes an intro-duction to the layout of metal structure,the selection of hoist,and the design ideas and features of the gate structure and embedded parts. Since been put into operation,the station has run safely for more than two years and its metal structure equipments are in good conditions,which proved that those equipments are in correct selection, reasonable layout and advanced technology and they are safe,reliable and cost-effective.关键词
金属结构/拦污栅/闸门/启闭机/越南占化水电站Key words
metal structure/trash rack/gate/hoist/Chiem Hoa hydropower station in Vietnam分类
建筑与水利