南水北调天津干线津保高速穿越工程顶进法施工工艺

马雪红

红水河Issue(5):21-25,5.
红水河Issue(5):21-25,5.

南水北调天津干线津保高速穿越工程顶进法施工工艺

Jacking Construction Technology for Tanjin-Baoding Expressway Crossing Project in South-water-north Tianjing Trunk

马雪红1

作者信息

  • 1. 中国水利水电第四工程局有限公司,河北涿州072750
  • 折叠

摘要

Abstract

During construction of long distance water diversion project,water conveyance structure inevitably crosses with the existing expressway,railway and other structures. Tanjin-Baoding expressway crossing project for south-wa-ter-north Tianjing trunk adopts box culvert jacking construction technology under steel pipe curtain support, which not only greatly improves the construction speed,reduces material loss and staff input, effectively controls the road surface settlement,but also guarantees the safe operation of expressway during construction.

关键词

南水北调/输水箱涵/顶进法/穿越施工

Key words

south-water-north/water delivery culvert/jacking method/crossing construction