| 注册
首页|期刊导航|红水河|如何加强水电站工程进度管理

如何加强水电站工程进度管理

李韩星

红水河Issue(6):10-12,3.
红水河Issue(6):10-12,3.

如何加强水电站工程进度管理

How to Strengthen the Progress Management of Hydropower Projects

李韩星1

作者信息

  • 1. 广西水利电力建设集团有限公司,广西 南宁 530028
  • 折叠

摘要

Abstract

Progress management can be realized by scientific and reasonable arrangement of all kinds of project ac-tivities related to the construction progress and developing systematic schedule objectives based on the project progress, by which the project can be completed as soon as possible with satisfied quality. In this paper, the author takes the extension project of Bagong hydropower station in Hechi as an example, the existing problems in progress management are briefly analyzed, besides, some measures are put forward thereof to strengthen the progress manage-ment of hydropower projects.

关键词

工程进度管理/拔贡水电站改扩建工程

Key words

project progress management/Extension Project of Bagong Hydropower Station

分类

建筑与水利

引用本文复制引用

李韩星..如何加强水电站工程进度管理[J].红水河,2013,(6):10-12,3.

红水河

1001-408X

访问量0
|
下载量0
段落导航相关论文