拔贡水电站改扩建工程同期系统设计相关问题的探讨

卢庆平

红水河Issue(6):59-61,3.
红水河Issue(6):59-61,3.

拔贡水电站改扩建工程同期系统设计相关问题的探讨

Discussion on Design of Synchronization System for Extension Project of Bagong Hydropower Station

卢庆平1

作者信息

  • 1. 广西水利电力建设集团有限公司金城江水力发电厂,广西 河池 547000
  • 折叠

摘要

Abstract

"Few people attendance and even no people attendance power project" is a new tendency required by power projects, especially hydropower projects, since entering the twenty-first century, so as to reduce labor costs and improve automation level of the power station. While, an important link in achieving this goal is the computer actuarial technology of the synchronous system. The synchronization system of the extension project of Bagong hydropower sta-tion is designed and purchased according to related principles and requirements;however, there are still some prob-lems found in practical applications of the system equipments, although these equipments are basically famous do-mestic and foreign products.

关键词

同期系统/拔贡水电站改扩建工程

Key words

synchronous system/Bagong Hydropower Station Extension Project

分类

信息技术与安全科学

引用本文复制引用

卢庆平..拔贡水电站改扩建工程同期系统设计相关问题的探讨[J].红水河,2013,(6):59-61,3.

红水河

1001-408X

访问量0
|
下载量0
段落导航相关论文