摘要
Abstract
The extension project of Bagong hydropower station installs two bulb tubular hydro-generating units with single capacity of 10.5MW and the runner diameter of 3.75m. The experiences on determining the unit technical pa-rameters and structural characteristics can be referenced by the design, manufacture and installation of small bulb hydro-generating units.关键词
水轮机/灯泡贯流式水轮发电机组/拔贡水电站改扩建工程Key words
turbine/bulb tubular hydro-generating unit/Extension Project of Bagong Hydropower Station分类
能源科技