| 注册
首页|期刊导航|红水河|西津水电站水库冲淤现状分析及库容曲线复核

西津水电站水库冲淤现状分析及库容曲线复核

江明新

红水河Issue(1):65-69,5.
红水河Issue(1):65-69,5.

西津水电站水库冲淤现状分析及库容曲线复核

Reservoir Deposition and Erosion Situation Analysis and Storage-capacity Curve Review of Xijing Hydropower Station

江明新1

作者信息

  • 1. 广西水电科学研究院,广西 南宁 530021
  • 折叠

摘要

Abstract

Since the reservoir of Xijin hydropower station has been put into operation, the riverbed topography and the storage-capacity curve were changed due to river sand mining, the project construction along the river, and the effects of floods etc. The riverbed evolution was analyzed and the storage-capacity curve was corrected through resurveying the fixed section topography of reservoir area.

关键词

库容曲线/冲淤/西津水电站

Key words

storage-capacity curve/deposition and erosion/Xijin hydropower station

分类

建筑与水利

引用本文复制引用

江明新..西津水电站水库冲淤现状分析及库容曲线复核[J].红水河,2014,(1):65-69,5.

红水河

1001-408X

访问量0
|
下载量0
段落导航相关论文