抽水蓄能电站泵工况断电过渡过程数值试验

周大庆 张蓝国

华中科技大学学报(自然科学版)Issue(2):16-20,5.
华中科技大学学报(自然科学版)Issue(2):16-20,5.DOI:10.13245/j.hust.140204

抽水蓄能电站泵工况断电过渡过程数值试验

Numerical experiments in power-off transient process of pumped storage power station under pump condition

周大庆 1张蓝国1

作者信息

  • 1. 河海大学能源与电气学院,江苏南京211100
  • 折叠

摘要

Abstract

Three dimensional unsteady numerical simulations based on VOF (volume of fluid) model were executed on geometrical model of the whole flow system including diversion ,tunnel ,surge tank , pump turbine unit and tailrace tunnel .T hrough numerical calculation ,the changeable flow configura-tion and variation law of some parameters such as unit rotate speed ,flux and static pressure of meas-urement points were obtained and compared with experimental date .Numerical results show that ex-treme value of unit rotate speed and measurement points’ static pressure agree fairly well with experi-mental date .The unit will undergo pump condition ,braking condition and turbine condition with ex-ternal characteristic varying significantly during power-off transient process .Internal flow configura-tion is closely related to external characteristic and affects each other .The flux variation trend will change rapidly w hen the maximum reverse flux appears under braking condition ,so there is one sharp turning point on the flux-time curve .At that moment ,the blade pressure is very uneven ,flow field gets worse in draft tube and water hammer is violent .

关键词

抽水蓄能电站/泵工况/过渡过程/断电/数值试验

Key words

pumped storage power station/pump condition/transient process/power-off/numerical experiments

分类

建筑与水利

引用本文复制引用

周大庆,张蓝国..抽水蓄能电站泵工况断电过渡过程数值试验[J].华中科技大学学报(自然科学版),2014,(2):16-20,5.

基金项目

国家自然科学基金资助项目(51106042). ()

华中科技大学学报(自然科学版)

OA北大核心CSCDCSTPCD

1671-4512

访问量0
|
下载量0
段落导航相关论文