电力系统保护与控制Issue(3):1-8,8.
风力发电对双电源快速切换的影响
Influence of wind power generation on fast transfer of double power supply
摘要
Abstract
The large-scale access of wind power generation to the distribution network makes it become the active network and affects the correct action of the fast transfer devices. This paper takes a 6 kV terminal substation of a petrochemical plant with the wind power generation connected for example, builds a simulation model by the EDSA software and analyzes the influence on fast transfer caused by the wind power generation (permanent magnet synchronous generators and double fed induction generator). The simulation results show that it’s helpful for fast transfer while the reactive power of permanent magnet synchronous generators is smaller than that of the loads. However, it needs to modify the available transfer criterion because the bus voltage will grow up or may exceed the protection setting value of the device when the reactive power of permanent magnet synchronous generators is larger than that of the loads. The situation that the active power of double fed induction generators is larger or smaller than that of the loads is not helpful for fast transfer. Meanwhile, this paper presents an improved fast transfer criterion for the power system with the wind power generation:adding the upper limit's constraint of bus voltage in the available transfer criterion for the power system with the permanent magnet synchronous generators;and enlarging the lower limit's constraint of bus voltage in the available transfer criterion for the power system with the double fed induction generator.关键词
风力发电/永磁同步发电机组/双馈异步发电机组/快速切换/切换判据Key words
wind power generation/permanent magnet synchronous generators/double fed induction generator/fast transfer/transfer criterion分类
信息技术与安全科学引用本文复制引用
卜繁多,梁志珊,夏鹏程..风力发电对双电源快速切换的影响[J].电力系统保护与控制,2014,(3):1-8,8.基金项目
中国石油大学(北京)前瞻导向基金项目(批准号2010QZ03)资助;中国石油天然气股份有限公司基金项目 ()