摘要
Abstract
Based on multiple periods and recycle multiple waste products, by allowing dynamic location of lo-gistics centers periodically, this paper constructs a mixed-integer programming model of reverse logistics network for remanufacturing. The model, taking the minimal total costs as the objective, considers the difference of parame-ter between each periods into account and the difference of parameter between each kinds of waste products. Through the model, we can obtain the quantity and the location of logistics center, and the logistics allocation be-tween network nodes. Finally, the effectiveness of this model is tested and verified through an example.关键词
逆向物流网络/多周期/动态优化设计Key words
Reverse Logistics Network/Multi-Period/Dynamic Optimal Design分类
管理科学