| 注册
首页|期刊导航|采矿与安全工程学报|深立井过瓦斯抽排孔群扰动煤岩层损伤评估与支护优化

深立井过瓦斯抽排孔群扰动煤岩层损伤评估与支护优化

黎明镜 荣传新 程桦 郑世豪

采矿与安全工程学报Issue(1):146-153,8.
采矿与安全工程学报Issue(1):146-153,8.

深立井过瓦斯抽排孔群扰动煤岩层损伤评估与支护优化

Damage evaluation and support optimization of deep vertical shaft through the coal and rock seams disturbed by array gas-discharging holes

黎明镜 1荣传新 1程桦 1郑世豪2

作者信息

  • 1. 安徽理工大学土木建筑学院,安徽 淮南 232001
  • 2. 安徽大学资源与环境工程学院,安徽 合肥 230601
  • 折叠

摘要

Abstract

Aiming to ensure the security of deep vertical shaft through the coal and rock seams which are disturbed by array gas-discharging holes, the disturbing mechanism is analyzed, and a damage eval-uation model is established based on the damage mechanics theory. Then, the stability of disturbance coal and rock seams, mechanical response of rock excavation and shaft lining placement are simulated by numerical method specific to a km deep vertical shaft in Haizi coal mine. Based on the analysis re-sult, support scheme of deep vertical shaft through the coal and rock seams disturbed by array gas-discharging holes is optimized. Results show that, to evaluate the damage of coal and rock seams disturbed by array gas-discharging holes, the erosion action of water in drill hole, pressure-relief and ar-ray holes effect of coal and rock seams should be considered at the same time, as the integrating of the three effect causes a larger damage of coal and mudstone stratum than the siltstone stratum. Disturbed coal and mudstone stratum is apt to be unstable in a great range. In order to ensure the stability of sur-rounding rock and support, firstly, before the vertical shaft pass through the relevant strata, gas-discharging holes are used in pre-grouting to reinforce the surrounding rock;secondly, during the excavate and pouring process of shaft lining, some strengthened initial support is constructed in time, and the tensile properties of shaft lining concrete is improved;thirdly, after the shaft lining pass through the disturbed strata, the surrounding rock is reinforced by backfill grouting in time.

关键词

突出煤岩层/瓦斯抽排孔群/损伤评估/井壁

Key words

gas outburst coal seam and strata/array gas-discharging holes/damage evaluation/shaft lining

分类

矿业与冶金

引用本文复制引用

黎明镜,荣传新,程桦,郑世豪..深立井过瓦斯抽排孔群扰动煤岩层损伤评估与支护优化[J].采矿与安全工程学报,2014,(1):146-153,8.

基金项目

国家自然科学基金项目(50874002) (50874002)

采矿与安全工程学报

OA北大核心CSCDCSTPCD

1673-3363

访问量0
|
下载量0
段落导航相关论文