南水北调与水利科技Issue(z1):20-21,2.
“12•7”
Watershed Runoff Parameter Analysis After July 21 Rainstorm Flood in the Northern Branch of Daqinghe River
刘同僧1
作者信息
- 1. 河北省廊坊水文水资源勘测局,河北 廊坊 065000
- 折叠
摘要
Abstract
On July 21, 2012, heavy rainstorm hit the water system of the northern branch of Daqinghe River in Haihe River Basin. Floods oc-curred at the Jumahe River in the northern branch of DaqingheRiver. The maximum flood flow at Zhangfang Hydrological Station in theupper reachesoftheJumaheRiverwas2570m3/s;themaximumfloodflowatLuobaotanHydrologicalStationinthesouthernJumaheRiverwas2 520m3/swithfloodvolume50millionm3.Whenthefloodwent40kmdownwardstotheBeihedian,itsmaximumflowreducedto120m3/s,and thefloodvolumetherewas18.62millionm3.Accordingtotheanalysisonhistoricalfloods,thetremendouschangesoftheparametersofrunoff yield and flow concentration in the tributaries of the Daqinghe River took place, which could directly influence the calculated flood results.关键词
暴雨/洪水/产流参数/汇流参数/变化Key words
heavy rainstorm/the flood/flow parameter/confluence parameter/Change分类
天文与地球科学引用本文复制引用
刘同僧..“12•7”[J].南水北调与水利科技,2013,(z1):20-21,2.