| 注册
首页|期刊导航|人民长江|嘉陵江亭子口水电站进水口分层取水设计

嘉陵江亭子口水电站进水口分层取水设计

邵年 廖远志 林学锋

人民长江Issue(4):32-35,40,5.
人民长江Issue(4):32-35,40,5.

嘉陵江亭子口水电站进水口分层取水设计

Design of multi-level intake of Tingzikou Hydropower Station on Jialing River

邵年 1廖远志 1林学锋1

作者信息

  • 1. 长江勘测规划设计研究有限责任公司 枢纽设计处,湖北 武汉430010
  • 折叠

摘要

Abstract

Multi-level intake facilities are expected to alleviate the impact of low-temperature water released from a hydro-power station on the eco-environment of downstream river channel, including agricultural irrigation, fish breeding. Tingzikou Hydropower Station is the first case of applying the multi-level intake facilities on dam in China. The paper presents a research on several technical issues including structural layout of multi-level intake, operation scheme of stop-log gate, and water tem-perature distribution of reservoir and temperature variation process of released water. Moreover, the design process is also elabo-rated.

关键词

低温水/分层取水/叠梁门/亭子口水电站

Key words

low-temperature water/multi-level intake/stop-log gate/Tingzikou Hydropower Station

分类

建筑与水利

引用本文复制引用

邵年,廖远志,林学锋..嘉陵江亭子口水电站进水口分层取水设计[J].人民长江,2014,(4):32-35,40,5.

人民长江

OA北大核心

1001-4179

访问量0
|
下载量0
段落导航相关论文