穿越采砂河段倒虹吸管防护方案设计

游万敏 黄星旻 夏国柱 刘子龙

人民长江Issue(6):24-26,3.
人民长江Issue(6):24-26,3.

穿越采砂河段倒虹吸管防护方案设计

Protection design of inverted siphon passing through sand mining river

游万敏 1黄星旻 1夏国柱 1刘子龙1

作者信息

  • 1. 长江勘测规划设计研究有限责任公司,湖北 武汉430010
  • 折叠

摘要

Abstract

A large inverted siphon of Middle Route Project of South to North Water Diversion passes through a sand mining riv-er. The sand mining lowered the river bed elevation and the inverted siphon was exposed to the river bed, resulting in water level rising and silting in the upstream and scouring in the downstream of the siphon. In order to guarantee the safe operation of the in-verted siphon, two solutions of horizontal protection and vertical protection are suggested. Through comprehensive comparison and considering the safety of the siphon, the vertical protection scheme is recommended and the clear requirements on the problems to be paid attention to in construction and operation of the siphon are put forward.

关键词

采砂河段/地形/水文变化/倒虹吸防护/南水北调中线工程

Key words

sand mining river/landform/hydrology variation/inverted siphon protection/Middle Route Project of South-to-North Water Diversion

分类

建筑与水利

引用本文复制引用

游万敏,黄星旻,夏国柱,刘子龙..穿越采砂河段倒虹吸管防护方案设计[J].人民长江,2014,(6):24-26,3.

人民长江

OA北大核心

1001-4179

访问量0
|
下载量0
段落导航相关论文