人民长江Issue(6):71-73,3.
陶岔-鲁山南段膨胀土渠道施工地质工作方法
Construction geological work methodology for expansive soil canal of Taocha to Lushan section
摘要
Abstract
The Middle Route Project of South-to-North Water Diversion is characterized by multiple geological sections and complex geological conditions, especially the expansive soil and underground water are the main geological problems in canal en-gineering. Therefore, the construction geological work has significant meanings for smooth construction and optimization of geolog-ical problems treatment. According to the engineering practice of canal construction of Taocha to Lushan section, we propose bas-ic requirements of construction geological work, geological logging for landslide and fissures, quick discrimination method of ex-pansive degree as well as some notes in data collection and organization for expansive soil.关键词
膨胀土/施工地质/陶岔-鲁山南段/地质编录/南水北调中线工程Key words
expansive soil/construction geology/Taocha to Lushan section/geological logging/Middle Route Project of South-to-North Water Diversion Project分类
天文与地球科学引用本文复制引用
阳云华,麻斌,马力刚,张良平..陶岔-鲁山南段膨胀土渠道施工地质工作方法[J].人民长江,2014,(6):71-73,3.基金项目
国家“十二五”科技支撑计划课题“施工期膨胀土开挖边坡稳定性预测技术”(2011BAB10B01) (2011BAB10B01)