| 注册
首页|期刊导航|人民长江|南水北调中西线工程对水源区水资源影响及对策

南水北调中西线工程对水源区水资源影响及对策

范杰

人民长江Issue(7):23-26,35,5.
人民长江Issue(7):23-26,35,5.

南水北调中西线工程对水源区水资源影响及对策

Influence of MRP and WRP of South-to-North Water Diversion on water resources in water source areas and countermeasures

范杰1

作者信息

  • 1. 长江勘测规划设计研究院,湖北 武汉430010
  • 折叠

摘要

Abstract

In order to control the unfavorable impacts of Middle Route Project ( MRP) and Western Route Project ( WRP) of South-to-North Water Diversion on water resources in water source area to an acceptable level, firstly, the development and u-tilization situation of water resources in water source area of MRP is introduced. The influence of water diversion is demonstrated in the aspects of discharge volume, downstream water level, river regime, flood control, water supply, environment, power gen-eration and navigation, etc. , and the countermeasures are put forward, including water diversion from Yangtze River to Hanjiang River, flood resources utilization, water saving and sewage treatment, and unified water resources regulation. The influence of WRP on water regime, ecology and environment and water consumption in water source area is described, and the further study i-deas are proposed.

关键词

水源区/水资源/跨流域调水/南水北调中线工程/南水北调西线工程

Key words

water source area/water resources/trans-basin water diversion/Middle Route Project of South-to-North Wa-ter Diversion/Western Route Project of South-to-North Water Diversion

引用本文复制引用

范杰..南水北调中西线工程对水源区水资源影响及对策[J].人民长江,2014,(7):23-26,35,5.

人民长江

OA北大核心

1001-4179

访问量0
|
下载量0
段落导航相关论文