猴子岩水电站面板堆石坝填筑质量监控
Quality control of CFRD filling of Houziyan Hydropower Station
孟建正1
作者信息
- 1. 四川二滩国际工程咨询有限责任公司,四川 成都610072
- 折叠
摘要
Abstract
The dam of Houziyan Hydropower Station is CFRD and the construction quality of CFRD is of great importance to the project construction. On the basis of introducing the performance indexes of dam materials and requirement of filling construc-tion technology, the specific procedures and work programs of quality control for CFRD filling are discussed; furthermore, for some difficult monitoring areas, the related solutions are proposed, which can provide guidance for the quality control of similar hydropower project construction.关键词
质量监控/填筑施工技术要求/面板堆石坝/猴子岩水电站Key words
quality control/filling construction technical requirement/CFRD/Houziyan Hydropower Station分类