猴子岩水电站面板堆石坝填筑质量监控

孟建正

人民长江Issue(8):96-98,102,4.
人民长江Issue(8):96-98,102,4.

猴子岩水电站面板堆石坝填筑质量监控

Quality control of CFRD filling of Houziyan Hydropower Station

孟建正1

作者信息

  • 1. 四川二滩国际工程咨询有限责任公司,四川 成都610072
  • 折叠

摘要

Abstract

The dam of Houziyan Hydropower Station is CFRD and the construction quality of CFRD is of great importance to the project construction. On the basis of introducing the performance indexes of dam materials and requirement of filling construc-tion technology, the specific procedures and work programs of quality control for CFRD filling are discussed; furthermore, for some difficult monitoring areas, the related solutions are proposed, which can provide guidance for the quality control of similar hydropower project construction.

关键词

质量监控/填筑施工技术要求/面板堆石坝/猴子岩水电站

Key words

quality control/filling construction technical requirement/CFRD/Houziyan Hydropower Station

分类

建筑与水利

引用本文复制引用

孟建正..猴子岩水电站面板堆石坝填筑质量监控[J].人民长江,2014,(8):96-98,102,4.

人民长江

OA北大核心

1001-4179

访问量0
|
下载量0