| 注册
首页|期刊导航|人民黄河|基于回归分析的龙门滩水库设计洪水计算

基于回归分析的龙门滩水库设计洪水计算

庞琼 陈鸣 王士军 谷艳昌

人民黄河Issue(12):37-40,4.
人民黄河Issue(12):37-40,4.DOI:10.3969/j.issn.1000-1379.2013.12.013

基于回归分析的龙门滩水库设计洪水计算

Design Flood Calculation of Longmentan Reservoir Based on Regression Analysis

庞琼 1陈鸣 2王士军 1谷艳昌3

作者信息

  • 1. 南京水利科学研究院,江苏南京210029
  • 2. 河海大学水利水电工程学院,江苏南京210098
  • 3. 水文水资源与水利工程科学国家重点实验室,江苏南京210029
  • 折叠

摘要

Abstract

As the lack of flow materials,dam site design flood only could be calculated with precipitation data for Longmentan Reservoir. Because those 7 precipitation stations including Dehua,Fengyang,Longmentan,etc. were built in different years,and each station’s precipitation data were not continuous,there were many vacant years,linear regression analysis method was used and linear regression equations were built to interpo-late and extend the continuous precipitation data into 57 years. Reasoning formula method,instantaneous unit hydrograph method and regional com-prehensive method were used to calculate the dam site design flood of Longmentan Reservoir.

关键词

回归分析/暴雨资料/设计洪水/龙门滩水库

Key words

regression analysis/rainstorm data/design flood/Longmentan Reservoir

分类

建筑与水利

引用本文复制引用

庞琼,陈鸣,王士军,谷艳昌..基于回归分析的龙门滩水库设计洪水计算[J].人民黄河,2013,(12):37-40,4.

基金项目

国家自然科学基金资助项目(51209143);国家国际科技合作专项(2011DFA72810)。 ()

人民黄河

OA北大核心

1000-1379

访问量0
|
下载量0
段落导航相关论文