人民黄河Issue(12):120-121,124,3.DOI:10.3969/j.issn.1000-1379.2013.12.039
南水北调中线工程黄段渠道排水计算分析
Calculation and Analysis on Channel Drainage of North Yellow River to North You River Reach of the Middle Route of South-to-North Water Transfer Project
张帅 1陈妍 2马慧敏1
作者信息
- 1. 河南省水利勘测设计研究有限公司,河南郑州450016
- 2. 河南黄河水文勘测设计院,河南郑州450002
- 折叠
摘要
Abstract
In order to solve the canal lining stability against floating problem in high groundwater level of the north Yellow River to North You River of the Middle Route of South-North Water Transfer Project and calculate the groundwater uplift pressure of the canal lining,it reviewed the drainage measures of inner canal slope by using FEM. It analyzed the head sensitivity according to different discharge density,coarse sand cushion layer thickness,filtration coefficient,and foundation soil filtration coefficient combining in stable and unstable infiltration flow conditions. According to the analysis results,it put forward the adjustment measures of drainage blanket and lining tube of different groundwater elevation high level canal for optimizing the design of water supply and drainage and saving the engineering investment.关键词
渠道排水/渗透系数/地下水/南水北调中线工程Key words
channel drainage/filtration coefficient/groundwater/Middle Route of South-to-North Water Transfer Project分类
建筑与水利引用本文复制引用
张帅,陈妍,马慧敏..南水北调中线工程黄段渠道排水计算分析[J].人民黄河,2013,(12):120-121,124,3.